Roundabouts to replace traffic signaled intersections
ADA improvements
Wayfinding signage and pavement markings
Parking
Streetscape
Wide Sidewalks with decorative brick paver borders
Street trees, planter areas, and automatic irrigation system
Wifi and Outdoor Speaker systems
Water line
12-inch main line with new service lines to existing and future tenants
Fire hydrants
Fire line stub outs
Electrical
Primary upgrades to accommodate future tenant build-outs
Power for public events and activities
Power for new lighting fixtures, wifi system, and outdoor speaker system
Gateway features
Signage at both entrances into the Historical district
Fingerpost sculpture at Orchard Park
Storm Drain
Replaces aged Corrugated Metal Pipe with High Density Polyethylene pipe
Increases system capacity to meet the 100-year, 24-hour storm event
Meets minimum self-flushing velocity
Benefits of the Storm Drain Design:
Reduces future costs for downstream storm water improvements
Allows for future downstream pipe sizes to be reduced from the Master Drainage Study
Allows capture of large storm events without using valuable surface area for detention ponds
Provides additional protection against flooding in the historic downtown area
Helps preserve our river corridor by capturing the ‘first flush’ pollutant loads, remove sediment, and allows the water to safely infiltrate into the ground